Kingmax Factory Tour in Hsin Chu, Taiwan
By Gabriel Torres on June 3, 2005 Page 2 of 9

Kinpak Factory Tour


As we’ve explained, Kinpak is Kingmax’s sister company specialized in packing, i.e. cutting the memory wafer and adding a packing and pins to the memory silicon.

Kingmax Factory Tour
click to enlarge
Figure 1: Arrival at Kingpak.

Memory packing process is divided into two big steps: front-end and back-end. On Figure 2 you can see the steps inside the front-end process, while on Figure 3 you can see the steps inside the back-end process.

Kingmax Factory Tour
click to enlarge
Figure 2: Front-end steps for memory packing.

Kingmax Factory Tour
click to enlarge
Figure 3: Back-end steps for memory packing.

The whole process isn’t fast. For BGA memory chips the front-end process takes 5 days, while the back-end process takes 4.5 or 5.5 days.

Kingmax Factory Tour
click to enlarge
Figure 4: Some stats from the packing process.


Originally at http://www.hardwaresecrets.com/article/148/2Pages (9): 1 2 3 4 5 6 7 8 » ... Last »

© 2004-8, Hardware Secrets, LLC. All Rights Reserved.

Total or partial reproduction of the contents of this site, as well as that of the texts available for downloading, be this in the electronic media, in print, or any other form of distribution, is expressly forbidden. Those who do not comply with these copyright laws will be indicted and punished according to the International Copyrights Law.

We do not take responsibility for material damage of any kind caused by the use of information contained in Hardware Secrets.