| Testing |
The next step is to test the modules. All modules are tested using two procedures. First using a machine that does a quick preliminary test, and then a functional test in a real-world environment, i.e., on a PC running memory test software.
 click to enlarge Figure 9: First testing step (quick test).
 click to enlarge Figure 10: Overall vision of Kingston’s factory testing area.
After the modules are tested they are packed and have their packages labeled. The package labeling is done by a machine, which prints the label depending on the product being packed. After this process the modules, now packed, are put in boxes with 25 modules each. After that an employee checks if there are 25 modules on the box and if the label present on the module package is correct.
 click to enlarge Figure 11: Labeling machine.
|
| « Previous | Page 3 of 3 |
| Print Version | Send to Friend |
Bookmark Article
| Comments (2)
|
|
|
|
Recommended Deal |
 | Corsair VS2GB800D2
Corsair Memory VS2GB800D2 2 GB PC2-6400 800Mhz 240-pin DDR2 Dual Channel Desktop f-q2409-045 Electronics Used and New 800Mh
|
|
 Latest News
May 22, 2012 - 8:50 AM PST
May 21, 2012 - 9:43 AM PST
May 18, 2012 - 9:07 AM PST
May 17, 2012 - 12:49 PM PST
May 17, 2012 - 12:47 PM PST
May 15, 2012 - 5:17 PM PST
May 15, 2012 - 5:13 PM PST
May 15, 2012 - 5:04 PM PST
May 11, 2012 - 8:56 AM PST
May 10, 2012 - 7:44 AM PST
 Latest Content
Our Most Popular Articles
1,674,299 views
1,503,324 views
1,228,188 views
1,186,872 views
1,111,192 views
1,004,400 views
819,307 views
702,455 views
672,714 views
642,942 views
Latest Threads in Our Forums
by Cygnuz
by Merman
by Hardware Secrets Team
by Gabriel Torres
by Gabriel Torres
by shriganesh
by MUHAMMAD KHURRAM
by Mr. Smith
by Gabriel Torres
by Gabriel Torres
|